The second floor vapor barrier is going up on the walls with more drywall nearby to cover it.
The second floor washroom is already partitioned off and looks bigger than I thought...
YAHOO! Today the concrete pre-cast exterior signage has arrived and the long process of installing it will begin.
You're doing a great job re-directing traffic and pedestrians from the front of the gallery construction area... Keep smiling!
The last area for replacement of the bricks is ready to be repaired ...
The windows won't be ready until December so the crew has been building window frames and covering them with plastic sheeting to keep out the elements.