The stone mantle for the Carlyle gallery arrived at the Gallery today. We’ll store it there until it is ready to be installed at the new gallery.
The mantle is unpacked to make sure there is no problems with it.
The crew working on the front entrance to the new gallery… now that it’s built this area looks so big!
The floor deck of our elevator… WOW I love the sound of that word… elevator!
The fireplace in the future Florence Carlyle Gallery… I can hardly wait to see the stone mantle and brick work installed.
The first floor taping and mudding of the drywall is almost done… I love the way this part of the project seems to be racing along.
The light fixtures are staring to be installed in our second floor studio space.
The cabinets have arrived and are being installed in the second floor kitchen and in the birthday party room of the studio space.
The dropped ceiling in the community gallery is being installed and prepped for lighting.